The construction of the first phase of the Duna Terasz was started by Fadesa (Spain). The structure was ready for use when they sold the property and the building was later finished by GB Europa LLC.
In the building there are 360 flats and ground floor shops
Metropolis International LLC provided the project management service during the construction.
Address
Budapest XIII. district Turóc street
Sector
Residential building
Investor
GB Európa LLC
Designer
Lajos Hartvig
Role
Project management
Reliable project management is the secret to successful real estate development
Copyright © 2025 Metropolis International Ltd. All Rights Reserved.